
I have really enjoyed participating in the 2018 Finish-A-Long this year. There are a whole group of hosts, but I usually hook up at Marci Girl Designs.
Back in October, I listed my goals for the last quarter of 2018 here.
I did pretty well this time, I figure about 80%.
1) Angel quilt by Cheri Payne. Finish for my daughter for Christmas. Done. Where I started was here.
I did get it quilted and gifted for Christmas. The front
And back
2. Crow quilt to flimsy. This is another Cheri Payne pattern. This one was pretty much done, I just had some berries and my initials to applique on. DONE
3. Doll Clothes for Klara's BD doll by October 29th. DONE.
I made her baby PJ's, a hooded sweatshirt, pants and T-shirt, a pair of leggings and T-shirt. most were recycled fabric from Klara's old leggings and T-shirts.
4. Redwork embroidery of 3 Nursery Rhyme blocks for my SIL. DONE. She is going to put these together in a quilt for her first granddaughter. They went through here on the way to Oregon for Christmas and just left after staying several days. I was able to give her these three blocks finished. Only have 3 more!
Old King Cole
There Was a Man and He Had Naught
There was a man and he had naught,
And robbers came to rob him;
He crept up to the chimney top,
And then they thought they had him.
But he got down on the other side,
And then they could not find him;
He ran fourteen miles in fifteen days,
And never looked behind him.
And robbers came to rob him;
He crept up to the chimney top,
And then they thought they had him.
But he got down on the other side,
And then they could not find him;
He ran fourteen miles in fifteen days,
And never looked behind him.
This was not one I was familiar with..
Ding Dong Bell
5. Owl Redwork Table Runner for daughter. DONE. This was my own design, and I used leftover fabric from the 12 Days of Christmas In July blog hop table runner I did here
6. Great Pumpkin BOM quilt to flimsy stage. DONE..
7. Assemble Christmas panels for daughters for Christmas. NOT DONE. I had gotten these on clearance at Hobby Lobby,probably about 9 years ago. Never had a chance to work on them.
8. Do 2 more panels of Sweet Land of Liberty. NOT DONE. Lori at Humble Quilts is going to run another sew-along this year. I decided to wait until that starts up. I have been working on it with Susan at DesertSky Quilting and Edi who hasn't started hers yet, This is what mine still looks like.
9. Assemble my long-finished redwork ornaments. DONE. I made 3 sets at least 10 years ago. I gifted them to my daughters, but mine have not been completed. I did finish them in time for Christmas and I was finally able to put them on the tree.
10. Get ,my Fall Into a QAL blocks into a flimsy by November 13th. DONE. This was a quilt-a-long hosted by Partners in Design. I designed the center block.
So that was it. I completed 8 out of 10 of my goals this past quarter. I'd like to thank the 2018 Finish-A-Long hosts, and I will be linking up at Marci Girl Designs.
Thanks so much for stopping by! Karrin.
